BX8103 Sleeveless Training Top catalogue product
BX8103SL-0260

Spring/Summer 2026 · SL-0260

Custom BX8103 Sleeveless Training Top

A sleeveless training top catalogue reference for private-label tops and activewear range development. Start from the listed style and confirm fabric, finished GSM, measurements, colours, branding and packaging before sampling.

Fabric listed
73.31% Cotton, 26.69% Sorona (as specified)
Finished GSM
Confirm against the selected fabric specification and swatch.
Sizes listed
S-2XL
Colours listed
Colours shown in photos
Standard MOQ
100+ pieces · logo customization and mixed sizes supported
Custom MOQ
300–500+ pieces · applicable minimum confirmed by style and colour breakdown
Sample timing
3–4 days standard · 3–7 days custom
Production timing
15 working days standard · 20–25 working days custom
Construction
Approve measurements, seams, trims and tolerances on the physical sample.
Care & packaging
Finalize wording and packing configuration after material and branding approval.
Sleeveless Training TopSpring/Summer 2026Standard style + logoCustom development
WhatsApp about this style

Catalogue page 71. Exact stock, shade, base pattern and order terms are reconfirmed in writing.

Physical sampleApprove the garment before bulk.
Written specificationRecord measurements and tolerances.
Material approvalConfirm fabric, GSM and colour.
Quote-specific packingClose packaging and carton details.

MOQ & order options

Choose the route that matches your project.

01

Standard style + your logo

Start from this catalogue style, then confirm current colour and size availability, decoration and the written quotation.

100+ pieces
02

Full custom development

Change fabric, colour, measurements, construction, labels or packaging through a new approved specification.

300–500+ pieces
03

Sample development

Approve measurements, movement, fabric, colour, stitching and decoration before bulk production.

3–4 days standard
3–7 days custom
04

Bulk production

Production timing begins from the written start point and required approvals; shipping transit is separate.

15 working days standard
20–25 working days custom

Decoration methods to evaluate

EmbroideryScreen printTransfer

Product decisions

Review the details that determine the finished garment.

01

Fabric & hand feel

The catalogue lists 73.31% Cotton, 26.69% Sorona (as specified). Confirm the selected fabric, finished GSM, stretch, surface and hand feel with a swatch and garment sample.

02

Construction & fit

Use the catalogue image as a style reference. Record garment measurements, grading, seam construction, trims and tolerances in the approved specification.

03

Colour approval

Colours shown in photos. Confirm shade under agreed lighting and record the approved colour standard before bulk production.

04

Decoration & packaging

Review embroidery, screen print or transfer against the intended artwork and placement. Confirm label content, individual packaging, carton marks and pack ratio in the quotation.

Customization

Make the style work for your brand.

Use the catalogue garment as a starting reference. Each change is closed in the specification, quotation and approved sample.

Logo & artwork

Send vector artwork, finished dimensions, placement and colour. The decoration method is selected and approved on the actual garment.

Embroidery · Screen print · Transfer

Labels

Confirm brand label, size marking and care-label content after the final fabric and decoration are approved.

Brand label · Size marking · Care label

Custom colour

Send the target shade or colour standard. Minimums and approval method depend on the selected fabric and colour breakdown.

Shade standard · Swatch approval · Colour allocation

Fabric & GSM

The listed composition is the starting reference. Specify the intended weight, stretch, hand feel and performance requirement for sourcing and sampling.

Composition · Finished GSM · Hand feel · Stretch

Measurements & grading

Confirm base size measurements, fit direction, grade rules and tolerances before approving the physical sample.

Base size · POM · Grade rules · Tolerance

Packaging & cartons

All products support custom individual packaging and custom cartons. Confirm the bag or box material, dimensions, artwork, carton marks, pack ratio, quantity and any destination requirements in the quotation.

Individual pack · Artwork · Carton marks · Pack ratio

Buyer answer

Is this style a good starting point for your project?

This sleeveless training top is a useful starting reference for private-label tops and activewear range development. Choose the standard route when the listed style meets the brief and you mainly need branding; use custom development when fabric, colour, measurements or construction must change. Mention SL-0260 so the exact specification can be closed before quotation and sampling.

What is the MOQ for this catalogue style?

The confirmed standard-style starting point is 100+ pieces with logo customization and mixed sizes supported. A custom version starts at 300–500+ pieces; the applicable minimum is confirmed by style and colour breakdown in the quotation.

Can I change the colour, fabric or measurements?

Yes, these can be reviewed through the custom-development route. Send the required colour, fabric or GSM direction, garment measurements and intended quantity so feasibility, the applicable minimum and sampling route can be confirmed.

How long does a sample take?

A standard sample takes 3–4 days and a custom sample takes 3–7 days. Sample fees, revision rounds and delivery charges are confirmed separately.

Do I need a finished tech pack to start?

A finished tech pack reduces ambiguity, but the catalogue style reference, a reference sample or image, and a structured brief can start the discussion. Missing decisions still need to be closed before bulk production.

Which logo method should I use?

Review print, transfer or embroidery against the selected fabric, artwork and placement. Approve appearance, hand feel, backing, stretch and wash performance on the actual garment before bulk production.

What should I send for a quotation?

Send style reference SL-0260, estimated quantity, size split, destination, target date, logo artwork and placement, colour direction, required material or GSM, packaging needs and any measurement changes.

Ask about this style

Interested in BX8103?

Send the style reference, estimated quantity, destination, size split and the changes you need. We will confirm missing specifications before quotation or sampling.

You are asking aboutSL-0260 · BX8103 · Sleeveless Training Top
WhatsApp about this styleEmail SenLin directly

Quick RFQ form

All three fields are required. SenLin uses these details to reply; do not include confidential files.